Natural Swimming Pools & Ponds
natural page1 swimmingponds5
Excavation
excavation h11
Dumpster Roll off services
dumpster sq
Emergency Storm Recovery
storm 2 sq
Land Clearing
land clearing h27
Site Prep
site prep h57
Water & Erosion Control
erosion sq1
Material Deliveries
dumpster roll off h2
Additonal Services
9a9a4d0d 9db8 4ea1 b59f 149fbf08914b

Concrete

  • Apron
  • Driveway
  • Walkway
  • Patio
  • Monolithic slab
  • Footers
  • Landing pad
  • Steps
  • Demolition

Concretehouse 1 B Concretehouse 1 A
Culvetrt B Scaled CULVERT A Scaled

Culvert

Culvert Applications:

  • Concrete Apron
  • Concrete Mitered End
  • New culvert installation
  • Culvert replacement
  • Driveway installation (Asphalt, Gravel, Concrete)
  • Pipe Arch Culverts

Common Size :

  • 12”, 15”, 18”, 24” (Round)
  • 13”x17”, 15” x 21”, (Elliptical)

Culvert Types by Material :

  • Corrugated Metal Pipe (CMP) or Corrugated Steel Pipe(CSP)
  • Reinforced Concrete Pipe (RCP)
  • High-Density Polyethylene (HDPE) Pipe
  • Plastic Pipes: Include PVX and ADS N-12 dual wall pipes

Dumpster Roll Off Services

Size: 15 yards, 20 yards, 30 yards

Service Area: 25 miles radius from Plant City, FL

Dumpster 1 B Dumpster 1 A
STORM B Scaled STORM A Scaled

Emergency Storm Recovery

  • Emergency Tree Removal
  • Emergency Debris removal
  • Home Removal and debris

Excavation

  • Excavation
  • Retention Ponds
  • Cattle Pond excavation
  • Pool Excavation
  • French Drainage
  • Trenching
  • Tree removal
  • Stump Removal
  • Footers

EXCAVATION BB Scaled EXCAVATION A
Grading 1 B Grading 1 A

Grading

  • Grading
  • Final Grade
  • Rough Grade
  • Foundations (Monolithic slab) (Stem wall)
  • Lot Scrape
  • backfilling
  • compacting (roller compactor, vibratory plate compactor, )
  • driveway installation (Asphalt, Gravel, Concrete, Recycled Aggregate, Sand, Granite)

Land Clearing

  • Residential Land Clearing
  • Commercial Land Clearing
  • Agricultural Land Clearing
  • Brush Mulching
  • Bush Hogging
  • Overgrowth Clean Up

Land Clearing H26 Water Erosion H44
natural page3 package3

Natural Swimming Pools & Ponds

  • Ponds and Waterfalls
  • Ecosystem Ponds
  • Swimming Ponds
  • Pondless Waterfalls
  • Fountainscapes
  • Rainwater Harvesting Systems

Site Prep

  • Clear Site for New Construction
  • Scrape Lot
  • Tree Removal
  • Silt Fence
  • Tree Barricade
  • Roll Off Dumpsters
  • Temporary and Permanent Culverts

Site Prep B Site Prep A
EROSION B Scaled EROSION A Scaled

Water & Erosion Control

  • Drainage solutions
  • French drainage
  • Culvert
  • ADS Pipes (advanced drainage systems)
  • Channel Drains
  • 4” and 6” Solid Wall PVC
  • Trenching
  • Under drainage
  • Trench a safe passage for your property to drain properly.
  • culvert pipe

Material Deliveries

  • Dirt
  • Top Soil
  •  Road Base
  • Crushed Asphalt
  • Granite
  • River Rock
  • Sand
  • Recycled Crushed Aggregate 
  • Mulch

Material 1 B Material 1 A
Additional 2 Sq Additional 1 Sq

Additional Services

  • Custom Designs
  • Sod Installation
  • Paver Installation
  • Poured-in-Place Rubber
  • Synthetic Turf

Why Choose
Level One Grading

  • Communication & Reliable Timeline
  • Commercial & Residential Experience
  • Multi-Phase Project Management
  • Pride in Every Project – Big or Small
  • Licensed & Insured for Peace of Mind
  • +60 FIVE STAR GOOGLE REVIEWS ⭐️⭐️⭐️⭐️⭐️
fb img 1700684911475
Level One Grading Files 2 1 768x693

Ready to start your next project? Our team is here to help.

Follow Us